Completed Castle Point Schemes

The completed schemes have been archived for public interest and review.

Please select the relevant scheme from the options below.

Key locations on the A127 London to Southend Arterial Road have been identified for safety barrier repairs, which is also known as a vehicle restraint system (VRS).

The work will be focused on a 300m section of the A127 east bound, between A1245 on slip and Rayleigh Weir that sits on top of the embankment (known as Rayleigh Cutting). To support these works, temporary lane restrictions will in place to both the east and west bound carriageways, reducing the available lanes to one in both directions. 

To minimise disruption to the drivers, the barrier repairs will be carried out overnight from Sunday 15 August 2021, with restrictions lifted during the daytime.

B1014 Somnes Ave cycle improvements
With effect from Friday 1 February 2019 for a period of 18 months the Experimental Order will be in place .  
Information relating to repair works being carried out on Canvey Island Bridge.
Information relating to improvements planned for Hadleigh High Street
Information relating to the traffic signal renewal on London Road / Rectory Road, Hadleigh.
Information relating to a traffic signal renewal located on Rayleigh Road, Hadleigh, Benfleet
Information related to the pedestrian crossing renewal on High Street, Epping