Uttlesford Schemes

Schemes that are being carried out or developed within Uttlesford.

Please select the relevant scheme from the menu or use the search below to filter the schemes.

Armitage Bridge, located on the B184 Walden Road in Thaxted is in a weakened condition and needs to be replaced.  

We are in the early stages of our preparations to carry out the works, which we anticipate will begin in 2022.

Since 2015, we have been investigating improvements to the A120 and slip road access to Junction 8 of the M11. Our studies show that the best short- to medium-term solution would be to improve off-slip lane capacity onto Junction 8 of the M11 with a widened A120 signalised junction, to help meet future network demand.
Information related to highway works at Saffron Walden High Street.

As part of planning conditions for the development of properties on land to the east of Parsonage Road in Takeley (UTT/19/0394/OP and UTT/22/0152/DFO), improvements to the local highway are required. This includes the construction of a new roundabout to serve the new development of 110 dwellings to the west, as well as a new care home to the east.

Information relating to bridge reconstruction works at Wicken Fen Bridge located on School Lane, Newport, Saffron Walden.